|
National Science Foundation, “Innovative Ventures for Emerging
Technologies in Rural North Louisiana”; with M. Chopin, T.
Noble, K. Varahramyan, and M. McShane; November 2003-October
2006; $599,937. (BoRSF Match of $30,000)
National Science Foundation, “Take a Walk on the Reviewer’s Side
Grant Writing Workshop”; with S. Herrmann; July 2004-September
2004; $7,000.
National Science Foundation, “Louisiana Tech’s Graduate K-12
Teaching Fellows Program”; co-PI with D. Mills, J. Dauzat, L.
Ramsey and S. Reagan; May 2003-April 2006; $1,485,997.
National Science Foundation, “North Louisiana Partnership for
Innovation: Creating Infrastructure for Technology Growth”;
co-PI with A. Scheffler, J. Orban, P. Sisson and S. Conrad; July
2003-June 2006; $599,474.
Louisiana Information Technology Initiative; State of Louisiana;
“Establishment of the Center for Entrepreneurship and
Information Technology (CEnIT) at Louisiana Tech University;”
$1.86M/year operating funds and $540,000 in capital
outlay.
Sandia National Labs, “Design and Fabrication of Novel Fluidic
Systems;” with R. Besser and M. McShane; 2002-2003; $396,000.
BORSF, "Graduate
Fellows for ACAM, BME, & ENGR PhD Students”; 2000-2004;
$128,000.
BORSF,
"Recruitment of Superior Students for the PhD Program in
Engineering"; with Richard Greechie; July 1999-June 2003;
$70,000.
BORSF,
"Evaluation
of Drill Pipe in Mini-HDD Construction"; with P.F. Hadala (P.I.),
R. L. Sterling and W.M. Jordan; July 1998-June 1999; $118,000.
LEQSF,
"Development
of a Preliminary Sanitary Sewer Management System"; with N.D.
Pumphrey (P.I.), F.L. Roberts and R. Nassar; June 1995-June
1999; $100,000.
City
of Baton Rouge, "Tests
for Evaluating Fluid Migration in the Annular Space of Lined
Piping Systems"; with Dr. R. Bakeer (Tulane); December 1995-July
1997; approximately $50,000.
InLiner USA, Inc., "Experimental
Program for Evaluating InLiner USA Pipe Installed in Host
Pipes"; with Dr. W. T. Straughan (Co-P.I.); Aug 1995-March 1996;
$25,780.
U.S.
Army Engineer Waterways Experiment Station;
"Evaluation
of a Fail-Safe Retrievable Microtunneling System"; with others;
October 1994-May 1995; $15,000.
Shell
Development Company, "Evaluation
of Different Epoxy Resin Systems in CIPP Applications," March
1993-June 1994; $60,371.
U.S.
Army Corps of Engineers Construction Productivity Advancement
Research Program; "Trenchless
Construction: Evaluation of Methods and Materials to Install
and Rehabilitate Underground Utilities"; with D.T. Iseley and
R.D. Bennett; primary responsibility for pipeline rehabilitation
component; January 1991- January 1993; approximately $1.5
million including match.
Federal Highway Administration's Research Fellowship Program;
"Analysis of Vehicle Dynamic Forces"; Turner-Fairbank Highway
Research Center; July 1988-June 1989; $17,295.
Louisiana Transportation Research Center and Federal Highway
Administration; "Traffic Accident Simulation Using Interactive
Computer Graphics"; with D.O. Anderson (P.I.); August 1987-July
1990; $299,996.
U.S.
Army Engineer Waterways Experiment Station; Reinforced concrete
slabs subjected to static and dynamic loadings; (P.I.); May
1983-May 1987; $132,450.
U.S.
Army Engineers Waterways Experiment Station; "Effects of Weapons
on Structures"; principal investigator; March-August 1986;
$27,500.
U.S.
Army Engineer Waterways Experiment Station;
"Three-Dimensional
Finite Element Mesh Generator"; July 1981-January 1982.
U.S.
Army Engineer Waterways Experiment Station;
"Computer-Aided
Graphics for Engineers"; July-August 1979. |